Progress
The photos above are of the gable over the master bedroom. Our contractor made it out to the Queen Friday and enclosed the whole thing. The photos don't really show have great of a job he did on all the miter cuts. There are two separate pieces of crown molding running under the eves, and I wouldn't want to try to figure these angles out.
I'm curious how fast things will go. My wife and I think that they'll be finished with siding the house in 1 1/2 to 2 weeks. That will give us 1 to 2 weeks for them to work on the interior.
0 Comments:
Post a Comment
<< Home